TRANXACT.AI Help
Platform › Process & Structure

Approval Document Types

What can be sent for approval. The built-in types are run by their own modules' rules (listed under Approval Rule Catalogue) or by self-service; add a type of your own by naming the table it lives in. No code needed.

Where to find it

  1. Module: Platform
  2. Group: Configuration
  3. Section: Process & Structure
  4. Screen: Approval Document Types

Address in the console: /platform/approval-doc-types

List · 6 columns · 18 fields on its form · 5 of them required

What the list shows

These are the columns of the list, in the order they are drawn. Any of them can be sorted on, filtered on, hidden, or exported.

ColumnKindField name
TypeCodedoc_type
NameTextlabel
Run byStatusengine
TableCodetable_name
No rule appliesStatuswhen_no_rule
ActiveYes or nois_active

The form

What is asked for when a record is created here. Required fields are marked; a choice drawn from a configuration list is one an administrator can extend without a release.

FieldTypeChoicesNotes
Type key required Text Lower case, such as expense_claim or contract.
Name required Text
Table required Text schema.table, such as crm.contracts. It must carry org_id.
Id column Text
Number column Text The column people know the document by.
Amount column Text Routes can be limited by amount when this is named.
Currency column Text
Description column Text
Org unit column Text Routes can be limited to an org unit, and org-unit-manager steps need it.
Screen module required Text The module of the screen the documents are kept on, such as crm.
Screen resource required Text The screen key, such as contracts. Only people who may change that screen can send one for approval.
Status column Text
Status when approved Text
Status when rejected Text
When no route applies Choice Refuse to send it (safe), Approve it automatically
Requester may approve their own Yes or no
Active Yes or no
Description Long text

The rules that apply here

Everything on this screen obeys the platform rules rather than rules of its own. The ones worth knowing before you use it:

Beside it in Process & Structure