TRANXACT.AI Help
Module

Manufacturing

BOMs, routings, work centers, and production execution with lot genealogy and WIP accounting.

10 groups · 22 sections · 115 screens

Design

What the product is, the drawing that says so, and the authority to change either.

Engineering

4

How products are built and where.

Design & Documents

10

What the product is, the drawing that says so, and the program that cuts it.

Workspace3D ModellerImport STL or OBJ, or generate a primitive. The volume shown beside a model is computed from the same triangles it is drawn from.OpenRecordsModelsGeometry held as a mesh rather than a file, so it can be measured. A model that is not closed reports no volume rather than a wrong one.OpenRecordsAssembly StructureWhich models sit inside which, and where. An assembly cannot contain itself at any depth.OpenWorkspaceStructure ExplorerThe bill of material both ways: exploded and costed downwards, and where-used upwards. One walk, written once, so the shortage report, the costing run and this screen agree.OpenRecordsEngineering DocumentsThe drawing, the model, the specification and the work instruction — under change control, so a released revision is frozen and a superseded one is kept.OpenViewDocument RevisionsEvery version, with who drew it, who checked it and who released it. A released revision is not editable — it is superseded.OpenRecordsDocument AssignmentsWhere a document is used. A drawing belongs to a part, but a routing operation and an inspection plan reference it too — and "what do I have to reissue" is that list.OpenRecordsCAM / NC ProgramsTied to an item REVISION, not to a part. A program posted against revision B and run against revision C makes a thousand parts that pass every check the machine makes.OpenRecordsProgram Tool ListsWhich tools a program loads, in the order it loads them.OpenRecordsToolingA tool is not an item and not a machine: its life is measured in cuts, and it is reground rather than replaced.Open

Change Control

5

The question, the decision, everything the decision touches, and who signed for it.

Plan

What the plant commits to, what would have to happen for it to be met, and the pull loops underneath.

Master Scheduling

5

What the plant commits to finish, and whether the critical resources could stand it.

Material Planning

3

What the netting run decided, ranked by what each exception costs. The run and its supply plans, planned orders and exceptions live in Supply Chain → Supply Planning; the workbench here is the plant’s view of them.

Kanban

5

Pull replenishment: a fixed number of containers, and the board that makes them visible.

Material Availability

3

Whether an order can be made: what is on hand, what is already promised to somebody else, what is on its way, and what has to be bought.

Make

The work in front of each machine, what was made, and the record that proves how.

Production

1

Release, issue, and complete against the ledger.

Shop Floor

8

The work in front of each machine, what was made, and every minute it did not run.

Batch Manufacturing

8

The recipe, and the executed record that makes a batch evidence rather than data.

RecordsMaster RecipesThe process industry’s counterpart of a BOM plus a routing: its steps carry parameters with specifications, and its quantities scale with batch size.OpenRecordsRecipe PhasesThe instruction as it is read on the floor. Held as text rather than as a reference because the executed copy has to be the one that was approved.OpenRecordsRecipe ParametersWhat has to be measured, and what it has to be. Fixed here, BEFORE the batch — which is the property that makes an in-spec judgement a fact rather than a later opinion.OpenViewBatch RecordsWhat a batch DID, in the order it happened, with every controlled parameter against the specification it was supposed to meet. Review by exception: the counts say whether it can be released without reading two hundred pages.OpenViewBatch StepsThe executed phases, in sequence. A step is executed through its own route and signed; it is never edited on a grid.OpenViewParameter CapturesEvery captured value against the specification that was fixed before the batch started. A correction does not overwrite — it points at the original, because an audit trail that can be edited is not one.OpenRecordsBatch DeviationsRaised at the moment it happens, by the person or the machine that saw it. A deviation opened at review time is a much weaker animal.OpenViewBatch SignaturesWho signed what, and what the signature MEANT. The signed content is hashed, so a later edit would not match — and there is no update path, because that is what a signature is.Open

Control

What is measured, what was wrong, and where a lot came from and went.

Quality Planning

4

What is measured, against what, with what — fixed before the goods arrive.

Quality Events

6

What was wrong, what was done about it, and whether it worked.

Inspection & Disposition

2

Every inspection with what was measured against what was specified, and the decision somebody authorised made when it failed.

Measurement & Traceability

4

The instruments, their calibration, and where a lot came from and went.

Plant Equipment

The machines, how well they ran, and the two ways they talk.

Equipment & OEE

6

The machines, what state each is in, and how well they actually ran.

Connected Plant

10

The two ways a machine talks: measurement that arrives, and control that is sent.

RecordsIoT GatewaysThe box between the plant network and this platform. A gateway rather than a direct device connection because that is how it is built — sensors do not have credentials.OpenRecordsIoT DevicesSensors, meters, counters, cameras and readers, each bound to the machine it measures.OpenRecordsSignalsWhat a device measures, one row per quantity. The scaling lives here because it is a property of the measurement — applied downstream, every consumer has to know it and one of them eventually will not.OpenViewReadingsThe series. A sensor that returns a value it does not believe is worse than one that returns nothing, which is why the quality flag is on every row.OpenRecordsAlert RulesA threshold, and how long it has to be true. Without the second, every rule fires on a single noisy sample and everybody turns alerting off.OpenViewAlertsWhat fired, with the threshold AS IT WAS. A rule changes; the alerts it already raised keep the threshold they were raised against.OpenRecordsPLC ControllersWrites are OFF by default, and that is deliberate: a write to a running machine is a physical action, and the safest configuration is the one where a misconfigured screen cannot take one.OpenRecordsPLC TagsA memory address in a machine. The min and max are enforced on THIS side of the network, where the error message can say why.OpenRecordsTag BindingsWhat a tag MEANS, and the reason this integration is configuration rather than code. "DB10.DBW4" is meaningless; bound as "good count for PRESS-02" it feeds OEE, confirmations and kanban without anybody writing a transformation.OpenViewPLC WritesEvery value this platform sends to a machine, requested and approved separately, with the old value recorded. This is the table an auditor asks for after an incident.Open

Maintain

Keeping the machine that makes the product.

Maintenance

10

Keeping the machine that makes the product — by a plan, or by its breakdowns.

RecordsMaintenance PlansWhat should be done, how often, and measured how — by calendar, by running hours, by cycles, or by a condition somebody is monitoring. The three are different strategies with different costs.OpenRecordsPlan Task ListsWhat the technician actually does. A task that records a MEASUREMENT is the basis of condition monitoring done by hand, and it needs a spec like any other measurement.OpenRecordsMaintenance OrdersPreventive and breakdown work in one document, deliberately: the ratio between them is the most useful number in maintenance, and it cannot be computed across two tables.OpenRecordsOrder TasksThe checklist as executed, with any measurement taken against its spec.OpenRecordsOrder PartsSpares consumed, out of the same storeroom as everything else. A maintenance module with its own parallel stock is how a plant ends up with two answers to how many bearings it has.OpenRecordsSpare PartsWhich parts belong to which machine — an equipment bill of material. Not mfg.boms: a BOM says what a product is MADE of, and this says what a machine can consume.OpenViewMeter ReadingsWhat turns "every 2,000 hours" into a date. A reading below the previous one is recorded as a RESET rather than as a negative — a replaced meter would otherwise poison every average built on it.OpenRecordsFailure ModesHow this KIND of equipment fails, with the effect and the detection method. Kept at the class rather than the machine, or the same bearing failure is entered forty times and never groups.OpenReportReliabilityMean time between failures and mean time to repair per machine, with the planned share. Deliberately not the OEE availability — they answer different questions.OpenReportSpares ExposureWhich machines are one long lead time away from a long outage. An insurance spare with three on the shelf is fine; the same part with none and a four-month lead time is a risk somebody should have signed for.Open

Intelligence

What is about to happen, what to do about it, and what it did on its own.

Manufacturing Intelligence

10

Fourteen capabilities that predict, recommend or act — each scored on what actually happened.

WorkspaceProduction CopilotAsk the plant a question in your own words. Answered from a fixed set of queries over this company’s own records, with the records named — and handed to the platform assistant rather than guessed at when it falls outside them.OpenViewAI CapabilitiesThe fourteen, with the two columns that matter: what each is ALLOWED to do, and how accurate it has been measured to be. Nothing ships able to act on its own.OpenViewPredictionsA scored statement about ONE record, with its drivers ranked — and the outcome filled in later, because a prediction is worthless until it can be compared with what happened.OpenViewRecommendationsWhat to do, what it is worth, and what somebody decided. A recommendation nobody accepted is the most useful record in the table.OpenViewVision InspectionsSurface and dimensional defects found by camera, with the sampled human verdict beside them. The disagreement rate — not the accuracy figure — is what decides whether a camera may act on its own.OpenViewRoot-Cause AnalysesRanked candidates from what actually CHANGED around the failure — material lots, machine states, batch parameters, control charts, gauge calibration. Never the last word: the accepted cause is a person’s.OpenRecordsException PoliciesWhen THIS exception appears, and it is within THESE bounds, do THAT — and tell somebody. The bounds are the difference between automation and an unattended system making commitments nobody sized.OpenViewAutonomous ActionsWhat the automation did, with the state before and after — which is what makes it reversible and what an auditor reads. A refusal is recorded too: a policy that quietly declines and says nothing is worse than one that does not exist.OpenRecordsDocument IntelligenceCertificates, mill reports and packing lists read into fields — and, the part that matters, CHECKED against the item’s specification. A certificate transcribed perfectly and compared with nothing has saved typing and nothing else.OpenRecordsWorkflow AdaptationsWhere a standard process was tightened or relaxed for a condition, and what ends it. An adaptation with no expiry is a permanent process change made by an automation, which is exactly what this screen exists to prevent.Open

Cost

What each order was quoted at, what it actually cost, and where the difference went.

Order Costing & Profitability

4

What each order was quoted at, what it actually cost, where the difference went, and which orders are going to lose money before they are finished.

Reporting

The catalog over everything above.

Reporting

2

Executive, management, operational and audit reporting over this module’s records.

More