TRANXACT.AI Help
Module

Supply Chain

Items, suppliers, purchasing, bin-level inventory, and warehouse execution. Receipts accrue GR/IR in Accounting.

9 groups · 40 sections · 200 screens

Master Data

What you stock, where it sits, how it is measured, and how it is configured.

Items & Suppliers

2

What you stock and who you buy it from.

Units & Packaging

7

What a quantity actually means, what it is packed in, and the numbered pallet standing on the floor.

Network

6

Where the business operates and where stock sits: location, warehouse, lane, shelf, bin.

Product Configurator

14

Configure to order, assemble to order, make to order and engineer to order. A model asks questions, rules constrain the answers, and resolving a configuration produces an item, a bill of material or an engineering request.

WorkspaceConfigure a ProductAnswer the model’s questions and watch the price, the lead time and the fulfilment strategy resolve as you go.OpenRecordsConfigurator · ModelsA configurable product and how a configuration of it gets made — configure, assemble, make or engineer to order.OpenRecordsConfigurator · QuestionsThe questions a model asks, in order. How many answers each takes decides whether it is a radio button or a checklist.OpenRecordsConfigurator · OptionsThe answers. An option with an item puts a part in the product; one without is a characteristic that changes price and paperwork.OpenRecordsConfigurator · RulesTwo kinds of rule in one list. CONSTRAINT rules say what may be chosen, as explicit pairs, because a rule has to be explicable to a salesperson standing in front of a customer. PROCESS rules say what the choice MEANS — which component, in what quantity, through which operation, with which inspection — and carry a condition written in the ordinary expression language.OpenWorkspaceConfigurator · WorkbookThe whole definition of a configurable product — models, characteristics, values, rules written as IF … THEN … sentences, components, operations and sub-assembly structure — as one Excel workbook to download, edit and upload; or many rules pasted as text at once.OpenViewConfigurationsWhat customers actually configured, what it came to, and whether it can be made yet.OpenRecordsConfigurator · ParametersThe named constants a calculation rule leans on — the process allowance, the cutting allowance, a density. Named so a formula reads as a sentence rather than as arithmetic over numbers nobody can place.OpenRecordsConfigurator · Sub-assembly InheritanceWhich of a parent model’s answers travel down to a child model, and under what name there. Without the map a sub-assembly is configured in isolation, and a 12 mm machine acquires a 10 mm axle.OpenViewConfigured · ComponentsEvery part the rules put in a configuration, at the quantity their formulas computed, with the rule that chose it. The answer to “why does this order have this part”.OpenViewConfigured · RoutingThe operations a configuration resolved to, in sequence, with the work centre, the time the rules computed and what each costs. A galvanizing operation that is not there is the answer to “why is this one cheaper”.OpenViewConfigured · InspectionsThe inspections a configuration’s characteristics decided on — incoming, in-process and final. The same rules that chose the parts choose what is measured.OpenViewConfigured · Cost SheetThe rolled-up cost of a configuration, element by element — material, labour, machine, setup, outside processing, scrap, freight, packaging and overhead. A total nobody can check is a total nobody can defend.OpenViewConfigured · WhyEvery fact about one configuration in one list: what was answered, what was computed from it, what that selected, and which rule did it. The screen a production engineer opens when an operator asks why the traveller says what it says.Open

Inventory Structure

1

The stocking level between a warehouse and a bin.

Sourcing

Ask the market, agree the terms, and keep the supplier honest.

Strategic Sourcing

7

Ask the market, score what comes back, and award it on the weights declared beforehand. A new event grows out of the last one.

Supplier Management

5

Onboarding through performance and risk — who may be bought from, and how well they do.

Contract Management

4

Authored from a template, held in one place, and enforced on the prices they fix.

Collaboration

3

What the supplier says is coming, what they confirm, and the conversation about it.

Direct Materials

2

Long-running agreements, the schedule released against them, and what the supplier has been told to expect.

Signatures

2

Documents sent to the other party to sign electronically, and who may sign them for the company.

Supplier Portal

2

Suppliers and carriers signing in for themselves, and the changes they ask for.

Purchasing

Demand through commitment, receipt, invoice and payment.

Requisitions & Orders

5

Demand through to commitment and receipt, against a cost center and a budget.

Buying

3

Catalogs, the policy that says how to buy, and receipt of what cannot be counted into a bin.

Procurement Control

8

Who signs for a requisition and in what order, who is covering for them this fortnight, how vendors are compared, what a subcontractor is holding, and everything between a customer order and its material that is not moving.

RecordsRequisition Approval RulesWhich purchase requisitions need a signature, and whose. The same shape a purchase order rule has, because a company should express its delegation of authority once.OpenRecordsApproval LevelsThe people a rule asks to sign, one level at a time, in order. A level whose approver has left or is on leave is skipped and the next one fills it; a level that must be filled by somebody holds the document instead. Works the same way for a purchase order and for a requisition, because it is one policy.OpenRecordsApproval DelegationsWho is signing for whom while they are away. A record rather than an edit to the rule: the rule still says what the company’s policy is, this says who is covering, and the approval itself says which of the two it went to and why.OpenViewRequisition ApprovalsEvery signature a requisition is waiting for, oldest first. A requisition may not become a purchase order until they are all in — and the database, not a screen, is what enforces that.OpenRecordsVendor Evaluation CriteriaWhat responses will be compared on, and how much each counts — declared before any response is opened. Criteria chosen afterwards are criteria chosen to fit the preferred answer.OpenViewVendor Evaluation ScoresWhat each vendor scored on each criterion, and what it was worth once weighted. Price, lead time and payment terms are each scored against the best response: the lowest offer, the shortest lead time, the longest credit. Unless the event says otherwise they weigh 60%, 20% and 20%.OpenRecordsMaterial at SubcontractorsWhat the company owns and is not holding: material issued to a subcontractor, what they consumed, returned and spoiled, and what is still out there.OpenViewProcurement ExceptionsEverything between a customer order and the material it needs that is not moving — unapproved requisitions, unawarded tenders, late deliveries, rejected material, overdue subcontractors and invoices that will not match.Open

Invoices & Payment

5

Capture, match against the order and the receipt, and propose what to pay.

Electronic Data Interchange

5

Orders, acknowledgments, ship notices and invoices exchanged with trading partners in X12 and EDIFACT.

Drop-Ship

2

Lines the vendor ships straight to the customer.

Inventory

Perpetual stock, individual units, and what to reorder.

Stock & Counts

3

Perpetual stock at bin, lot, and status grain.

Traceability

2

Individual units and everywhere they have been.

Replenishment

1

What to reorder, and when.

Returns

1

Goods coming back from customers, from authorisation to credit.

Warehouse

The structure of the building, the work that happens in it, and the trailers outside.

Warehouse Structure

7

The character of each area, the doors goods come through, and who does the work.

Warehouse Execution

8

Demand released together, work bundled for one person, and the moves that actually happen.

Yard

2

Trailers on site, which door they are on, and how long they have been standing.

Dock Scheduling

4

Who is at which door, when — booked by the warehouse or by the carrier.

Goods Movement

12

Scan it in, out or around. Barcode, RFID or a photograph of the delivery note — what gets typed is the exception, and it is counted.

WorkspaceScan & PostThe handheld screens: pick the application, pick the document, scan against its lines, and post. Or photograph the delivery note and confirm what it read.OpenWorkspaceFixed Asset DetailsScan a fixed asset to see its register entry and record a physical count — date, condition, quantity found and a remark. Views for working, non-working, unscanned, duplicate and missing assets.OpenWorkspaceFixed Asset LabelsFind assets by WBS element, creation date or whether their label was printed, choose several, and display and print their barcode labels.OpenWorkspaceDocument RetrievalScan the QR code on a printed material document, or type its number, to see what it moved, open the document and read its attachments.OpenRecordsMovement HistoryOne movement in progress. Scan a barcode, wave a tag or photograph the pallet; the platform decodes it, checks it and posts it. Every kind of movement is the same three steps.OpenRecordsItem BarcodesWhat is printed on the goods. A code is checked against its own check digit before it is stored, so a scan that fails later was wrong on the label.OpenRecordsRFID TagsEvery tag, what it is attached to, and where it was last seen. An EPC decodes to the GTIN and serial inside it.OpenRecordsRFID ReadersWhere tags are read: dock portals, handhelds, shelves and conveyors.OpenViewImage CaptureWhat a vision model was asked and what it answered, with how long it took and how confident it was. Kept so a reading can be challenged.OpenReportCapture EfficiencyHow much of each movement is actually scanned rather than typed. The point of automatic identification is to drive the typing to nothing, so it is measured.OpenReportCount VariancesWhat a count found against what the ledger believed, valued at standard cost.OpenReportRFID VisibilityWhere the tagged stock is, and how long since anything saw it.Open

Warehouse Systems

2

Another system already runs the warehouse. Map its vocabulary to this one and the movements flow both ways.

Transportation

What goes on the vehicle, who moves it, where it has got to, and what it cost.

Load Building

5

What goes on one vehicle and where on the deck each pallet sits — drawn, so a planner can see whether it fits before promising a date.

Freight Management

11

Who moves it, what they charge, the instruction they are given, and where it has got to.

RecordsCarriersWho moves it. A carrier IS a supplier as far as payables is concerned, so a freight invoice posts against the supplier record rather than into a second ledger.OpenRecordsCarrier ServicesWhat a carrier sells. "UPS" is not a service; "UPS 2nd Day Air" is, and it is the thing that has a transit time and a cutoff.OpenRecordsTransport LanesOrigin region to destination region, by mode. The unit a rate is quoted on and the unit a spend analysis is done on.OpenRecordsFreight ClassesThe NMFC scale. Density, stowability, handling and liability decide it, and it is the single biggest driver of an LTL price.OpenRecordsFreight TariffsA price agreement with a carrier. The rate basis is what lets one engine price parcel, LTL and truckload: three different arithmetics, one lane comparison.OpenRecordsAccessorial ChargesWhat a carrier charges for beyond moving the goods. Half a freight bill is usually these, and an accrual that ignores them is wrong by half.OpenRecordsFreight OrdersThe instruction to a carrier: collect here, deliver there, these stops in this order. Tendered, accepted, refused, offered to the next one down.OpenRecordsRate ShoppingWhat came back when several carriers were asked. Kept rather than thrown away: "why did we ship this on the expensive one" is a question somebody asks three weeks later.OpenRecordsRoutesThe drawn line and the plan behind it. Sequencing the stops is nearest-neighbour with time windows pulling a stop forward: crude, fast, and typically within a fifth of optimal on a delivery round.OpenViewTracking EventsWhat the carrier told us, when. The evidence behind an on-time-delivery figure, normalized so a dashboard does not have to know that UPS says "I" and FedEx says "IT".OpenViewCarrier ScorecardComputed rather than typed: what each carrier moved, what it cost, how much of it arrived on time, and how often their invoice was wrong.Open

Maps & Geography

4

Where everything is, in coordinates rather than in prose — and the live picture of what is moving between those places.

Third-Party Logistics

3

FedEx, UPS, DHL and the rest: what the platform knows how to speak, the accounts it speaks through, and the labels it buys.

Freight Forwarding

4

International: a house bill under a master bill, the boxes, the customs entry, and the spread the business is actually made on.

Freight Settlement

1

The carrier bill against what was agreed. Half of a freight invoice is usually accessorials, and an accrual that ignores them is wrong by half.

Planning

What will be wanted, what would have to happen for it to be met, and who does it when.

Demand Planning

6

What we think will be wanted, who disagreed, and how close last quarter turned out to be.

Supply Planning

5

What would have to happen for that demand to be met, infinite or finite, and the exceptions a planner actually works from.

Capacity & Scheduling

6

What has a finite amount of time in it, how much of it is already spoken for, and which machine does what at which hour.

Automation

1

What runs on its own, the limits it works inside, and when its schedule fires.

Reporting

The catalog over everything above.

Reporting

2

Executive, management, operational and audit reporting over this module’s records.

More