Cost Estimates

Explode the bill of material, price it, walk the routing, apply the overhead. Released, the estimate becomes the standard — and a standard that can be edited makes every variance since January a fiction.

Where to find it

  1. Module: Accounting
  2. Group: Planning & Control
  3. Section: Product Costing
  4. Screen: Cost Estimates

Address in the console: /accounting/cost-estimates

Read-only list · 13 columns · 2 actions

This list is read-only: its records are written by the work that produces them. A correction, where one is possible at all, is made where the record was created.

What the list shows

These are the columns of the list, in the order they are drawn. Any of them can be sorted on, filtered on, hidden, or exported.

ColumnKindField name
EstimateCodeestimate_no
ItemCodeitem_no
NameTextitem_name
VariantCodevariant_code
TypeStatusestimate_type
Lot sizeNumberlot_size
Unit costAmountunit_cost
PreviousAmountprevious_unit_cost
Change %Numbercost_change_pct
Material %Numbermaterial_share_pct
LinesNumberline_count
ExceptionsNumberexception_count
StatusStatusstatus

What you can do here

Cost an item primary

On the toolbar, above the list.

Asks for: Item* Costing variant Lot size Costing date Type

Release as standard primary

On each row of the list. Offered only on records where it applies.

Supersedes the old standard and revalues the stock it re-prices.

Asks for confirmation: Release this estimate as the standard and revalue stock?

* required