A plan and a cost collector at once, from the investment envelope down to the work package the money lands on.

In Accounting → Projects & Margin · 12 screens

ScreenKindWhat it is ColumnsFieldsActions
Project Plan Workspace The work breakdown, the network, the money and the critical path — drawn, because a project is a shape before it is a table. 0 0 0
Projects List A plan and a cost collector at once. The join between them is the work breakdown structure — a WBS element is simultaneously a piece of work and an account assignment. 16 33 5
Work Breakdown List Both a piece of work and an account assignment. A summary element plans and does not accept postings; a work package accepts them and is where the money actually lands. 14 26 0
Network Activities List The scheduled work below the WBS. Float is the point: an activity with zero float is on the critical path, and a day lost on it is a day lost on the project. 13 26 0
Activity Dependencies List What cannot start before what. A cycle in the network makes both scheduling passes non-terminating, so it is detected and named rather than survived. 6 5 0
Milestones List A billing milestone is what turns delivery into an invoice — the join between the plan and the cash. 12 13 0
Project Budgets List Versioned, because "what was the original budget" and "what is the budget now" are both asked and one mutable number answers neither. 9 12 0
Project Costs Read-only list Planned, committed, actual and billed in one table, because the four have to be compared and comparing four tables is how a project report disagrees with itself. 14 0 0
Project Resources List Who is booked to what, and for how much of their week. A named person, or a requirement not yet filled — both are real and the second is what a resource manager works from. 12 17 0
Risks & Issues List The exposure in money, so a risk register can be added up and compared with the contingency held. 12 15 0
Programs List A program exists to deliver a BENEFIT, and a program whose benefit is not a measurable number is a group of projects with a shared letterhead. 12 18 0
Portfolios List The envelope. A portfolio whose approved projects exceed its budget is the situation portfolio management exists to prevent, and it is invisible unless the envelope is a number. 12 16 1