TRANXACT.AI Help
Supply Chain › Warehouse Execution

Labor Standards

How long one of these tasks ought to take. Split into fixed and variable, because walking to the bin costs the same whether you pick one case or ten.

Where to find it

  1. Module: Supply Chain
  2. Group: Warehouse
  3. Section: Warehouse Execution
  4. Screen: Labor Standards

Address in the console: /scm/labor-standards

List · 10 columns · 15 fields on its form · 3 of them required

What the list shows

These are the columns of the list, in the order they are drawn. Any of them can be sorted on, filtered on, hidden, or exported.

ColumnKindField name
CodeCodecode
NameTextname
Task typeStatustask_type
WarehouseCodewarehouse_code
Storage typeCodestorage_type_code
Fixed minNumberfixed_minutes
Per unitNumberminutes_per_unit
Per lineNumberminutes_per_line
Allowance %Numberallowance_pct
ActiveYes or nois_active

The form

What is asked for when a record is created here. Required fields are marked; a choice drawn from a configuration list is one an administrator can extend without a release.

FieldTypeChoicesNotes
Code required Text
Name required Text
Task type required Choice Configuration list
Warehouse Choice Looked up from existing records Leave empty and it applies to every warehouse.
Storage type Choice Looked up from existing records
Resource type Choice Configuration list
Fixed minutes Number What it costs to get there at all.
Minutes per unit Number
Minutes per line Number
Minutes per meter walked Number
Rest and delay allowance % Number
In force from Date
Until Date
Active Yes or no
Notes Long text

The rules that apply here

Everything on this screen obeys the platform rules rather than rules of its own. The ones worth knowing before you use it:

Beside it in Warehouse Execution