Capacity & Scheduling

What has a finite amount of time in it, how much of it is already spoken for, and which machine does what at which hour.

In Supply Chain → Planning · 6 screens

ScreenKindWhat it is ColumnsFieldsActions
Capacity Board Workspace What every resource is being asked for against what it has, drawn as a bar per period with the available line across it. Where the bottleneck is, seen rather than argued about. 0 0 0
Scheduling Board Workspace The Gantt. One board serves a work center, a factory line and a delivery vehicle, because the shape of the problem is identical and three near-identical boards would be three near-identical bugs. 0 0 0
Capacity Resources List Anything with a finite amount of time in it: a work center, a crew, a vehicle, a driver. One list for all of them, because a factory whose bottleneck is its delivery fleet is a real and common situation. 12 25 0
Capacity Calendars List When a resource is actually available. Shifts, holidays, planned maintenance, a second crew on Saturday. One row per day, because the exception is the point. 10 9 0
Capacity Load Read-only list What a plan asks of a resource in a period against what it has. The row a finite run reads before it dares to schedule anything into a period. 12 0 0
Schedules List One board: this set of resources, over this window. A factory schedule, a work center schedule and a vehicle schedule are the same document with a different resource kind on it. 12 11 1