Manufacturing › Control
Measurement & Traceability
The instruments, their calibration, and where a lot came from and went.
In Manufacturing → Control · 4 screens
| Screen | Kind | What it is | Columns | Fields | Actions |
|---|---|---|---|---|---|
| Gauges | List | A measurement taken with an out-of-calibration gauge is not a measurement — and every result since the last good calibration is in question. | 12 | 18 | 1 |
| Calibration Records | Read-only list | As found before adjustment, as left after it. A record that only keeps as-left has thrown away the part that matters. | 13 | 0 | 0 |
| Traceability | Workspace | A lot in both directions: what went into it, everything it went into, and everywhere it left the building. A system that only walks one way sends somebody to a spreadsheet at the worst possible moment. | 0 | 0 | 0 |
| Cost of Poor Quality | Report | Internal failure, external failure and appraisal over twelve months, from the nonconformance records themselves. | 0 | 0 | 0 |