Master Scheduling

What the plant commits to finish, and whether the critical resources could stand it.

In Manufacturing → Plan · 5 screens

ScreenKindWhat it is ColumnsFieldsActions
Master Schedule Board Workspace The grid a master scheduler works in: forecast and orders consumed against each other, the balance carried forward, and available-to-promise per period — with the two fences shaded, because inside them the schedule is a promise rather than a plan. 0 0 0
Master Production Schedules List What the plant commits to finish, period by period. The consumption rule is the whole point: a company that adds forecast to orders builds everything twice. 11 17 4
Schedule Periods List One row per period. Forecast, orders and the carried balance are computed; the quantity and the firm flag are the decision. 12 0 0
Bills of Resources List What one unit costs in critical-resource time — deliberately coarser than the routing. The offset matters: press time for something shipped in week 14 is spent in week 11. 8 12 0
Rough-Cut Capacity Read-only list The load a master schedule would place on the critical resources, months before a routing is ever exploded. Kept as history so this plan can be compared with last month’s. 8 0 0