Manufacturing › Control
Quality Planning
What is measured, against what, with what — fixed before the goods arrive.
In Manufacturing → Control · 4 screens
| Screen | Kind | What it is | Columns | Fields | Actions |
|---|---|---|---|---|---|
| Inspection Plans | List | An inspection with no plan is one person’s opinion of what mattered that day. A plan fixes the characteristics, the method, the gauge and the sampling before the goods arrive. | 11 | 22 | 1 |
| Characteristics | List | What is measured, against what, with what. A gauge whose resolution is a tenth of the tolerance cannot police it, and the gauge R&R figure is the honest statement of that. | 13 | 18 | 0 |
| Control Charts | List | Limits computed FROM THE PROCESS, never from the specification — a process comfortably inside a wide tolerance can be wildly out of control and nobody would see it. | 14 | 15 | 2 |
| Subgroups | Read-only list | Every subgroup with its readings, its mean and range, and which control rules it broke. A point that breaks a rule while every part is in tolerance is the whole reason the chart exists. | 13 | 0 | 0 |