What the netting run decided, ranked by what each exception costs. The run itself is Supply Chain’s — these are its records seen from the plant.

In Manufacturing → Plan · 6 screens

ScreenKindWhat it is ColumnsFieldsActions
Planning Workbench Workspace What a planner actually opens: not four thousand planned orders, but the exceptions ranked by what each one costs. The first twenty rows are the morning. 0 0 0
Supply Plans Read-only list The netting runs, seen from the plant. Supply Chain owns the engine — a second one would be a second answer to "what should we build". Read-only here. 10 0 0
Planned Orders Read-only list What the run proposed. Firming a make proposal here creates the works order and records why — which is the one thing the planning table cannot keep. 9 0 1
Planning Exceptions Read-only list What the run wants somebody to look at. A run that produced four thousand orders and no exceptions has told nobody anything. 8 0 0
Planning Decisions Read-only list Why a planner firmed a proposal early, split it, or moved it. The planning table records that it was firmed; only this records the judgement, which is the whole content of a planner’s day. 10 0 0
Low-Level Codes Read-only list The deepest level each item appears at, which is what makes a netting run process components after their parents. A circular structure is flagged rather than thrown. 8 0 1