TRANXACT.AI Help
Supply Chain › Capacity & Scheduling

Capacity Resources

Anything with a finite amount of time in it: a work center, a crew, a vehicle, a driver. One list for all of them, because a factory whose bottleneck is its delivery fleet is a real and common situation.

Where to find it

  1. Module: Supply Chain
  2. Group: Planning
  3. Section: Capacity & Scheduling
  4. Screen: Capacity Resources

Address in the console: /scm/capacity-resources

List · 12 columns · 25 fields on its form · 4 of them required

What the list shows

These are the columns of the list, in the order they are drawn. Any of them can be sorted on, filtered on, hidden, or exported.

ColumnKindField name
CodeCodecode
NameTextname
KindStatusresource_kind
Work centerCodework_center_code
VehicleCodevehicle_code
Measured inStatuscapacity_uom
A dayNumberdaily_capacity
Efficiency %Numberefficiency_pct
EffectiveNumbereffective_daily_capacity
ConstraintYes or nois_constraint
Calendar daysNumbercalendar_days
ActiveYes or nois_active

The form

What is asked for when a record is created here. Required fields are marked; a choice drawn from a configuration list is one an administrator can extend without a release.

FieldTypeChoicesNotes
Code required Text
Name required Text
Kind required Choice Configuration list
Work center Choice Looked up from existing records A capacity resource is a planning view of something that already exists, not a second master.
Warehouse Choice Looked up from existing records
Vehicle Choice Looked up from existing records
Driver Choice Looked up from existing records
Warehouse resource Choice Looked up from existing records
Supplier Choice Looked up from existing records
Measured in Choice hours, units, kg, pallets, stops, km, shifts
Capacity a day required Number
Jobs at once Number
Efficiency % Number Real capacity is never nameplate capacity. This is the difference.
Target utilization % Number
Setup minutes Number
Teardown minutes Number
Treat as a constraint Yes or no A bottleneck-only run treats exactly the resources marked here as constraints.
May be overloaded Yes or no
Maximum overload % Number
Cost an hour Number
Overtime cost an hour Number
Currency Choice Configuration list
Calendar Text
Active Yes or no
Notes Long text

The rules that apply here

Everything on this screen obeys the platform rules rather than rules of its own. The ones worth knowing before you use it:

Beside it in Capacity & Scheduling