TRANXACT.AI Help
Supply Chain › Capacity & Scheduling

Capacity Calendars

When a resource is actually available. Shifts, holidays, planned maintenance, a second crew on Saturday. One row per day, because the exception is the point.

Where to find it

  1. Module: Supply Chain
  2. Group: Planning
  3. Section: Capacity & Scheduling
  4. Screen: Capacity Calendars

Address in the console: /scm/capacity-calendars

List · 10 columns · 9 fields on its form · 3 of them required

What the list shows

These are the columns of the list, in the order they are drawn. Any of them can be sorted on, filtered on, hidden, or exported.

ColumnKindField name
ResourceCoderesource_code
NameTextresource_name
DateDatecalendar_date
ShiftTextshift
FromTextavailable_from
ToTextavailable_to
CapacityNumberavailable_capacity
Measured inStatuscapacity_uom
Day typeStatusday_type
WhyTextreason

The form

What is asked for when a record is created here. Required fields are marked; a choice drawn from a configuration list is one an administrator can extend without a release.

FieldTypeChoicesNotes
Resource required Choice Looked up from existing records
Date required Date
Shift Text
Available from Time
Available to Time
Capacity required Number
Day type Choice working, weekend, holiday, maintenance, shutdown, overtime, training, reduced
Why Text
Locked Yes or no

The rules that apply here

Everything on this screen obeys the platform rules rather than rules of its own. The ones worth knowing before you use it:

Beside it in Capacity & Scheduling