What the company owns and is not holding: material issued to a subcontractor, what they consumed, returned and spoiled, and what is still out there.

Where to find it

  1. Module: Supply Chain
  2. Group: Purchasing
  3. Section: Procurement Control
  4. Screen: Material at Subcontractors

Address in the console: /scm/subcontract-issues

List · 17 columns · 10 fields on its form · 2 of them required · 2 actions

What the list shows

These are the columns of the list, in the order they are drawn. Any of them can be sorted on, filtered on, hidden, or exported.

ColumnKindField name
IssueCodeissue_no
SubcontractorTextsupplier_name
ItemCodeitem_no
DescriptionTextitem_name
Production orderCodeproduction_order_no
OpNumberoperation_no
Purchase orderCodepo_no
RequiredNumberqty_required
IssuedNumberqty_issued
ConsumedNumberqty_consumed
ReturnedNumberqty_returned
SpoiledNumberqty_scrapped
Still outNumberqty_balance
Value still outAmountbalance_value
Expected backDateexpected_back
OverdueYes or nois_overdue
StatusStatusstatus

The form

What is asked for when a record is created here. Required fields are marked; a choice drawn from a configuration list is one an administrator can extend without a release.

FieldTypeChoicesNotes
Subcontractor required Choice Looked up from existing records
Item required Choice Looked up from existing records
Production order Choice Looked up from existing records
Subcontracting purchase order Choice Looked up from existing records
Lot Text
Required Number
Unit Text
Unit cost Number
Expected back Date
Notes Long text

What you can do here

Issue to subcontractor primary

On each row of the list. Offered only on records where it applies.

The material stays the company’s stock while it is with the subcontractor: a component provided against a subcontracting order moves to stock at the subcontractor, and the vendor’s receipt consumes it.

Asks for: Quantity going out From bin Expected back

Receive

On each row of the list. Offered only on records where it applies.

Say what came back, what the subcontractor used and what was spoiled. Together they cannot be more than is still out; the issue closes when nothing is left out.

Asks for: Returned unused Consumed in the work Spoiled

The rules that apply here

Everything on this screen obeys the platform rules rather than rules of its own. The ones worth knowing before you use it: