Manufacturing › Plant Equipment
Equipment & OEE
The machines, what state each is in, and how well they actually ran.
In Manufacturing → Plant Equipment · 6 screens
WorkspaceAndon BoardWhat the plant looks like right now: every machine, its state, how long it has been in it, and what it is running. The wall screen and the shift report read the same query.OpenWorkspaceOEE BoardAvailability, performance and quality drawn as the time ladder they come from — because a plant told its OEE is 62% can do nothing with that, and one told it lost 340 minutes to changeovers can.OpenRecordsEquipmentThe physical machine, which is neither the work center (a scheduling object) nor the fixed asset (a ledger one). It names both.OpenRecordsMachine StatesOne row per state, opened when it starts and closed when it ends. A stop with no reason is the queue a supervisor clears — and until it is cleared, the loss analysis is unreliable.OpenViewOEE PeriodsThe computed answer per machine per shift, with every input kept beside it — because a figure recomputed against today’s nameplate rate cannot be compared with last quarter. A period is not typed in: Compute OEE works it out for a day from the machine states and counts.OpenReportLoss AnalysisThe six big losses in minutes, ranked. A plant told it lost 340 minutes to changeovers can act; one told its OEE is 62% cannot.Open
Columns, fields and actions
| Screen | Kind | What it is | Columns | Fields | Actions |
|---|---|---|---|---|---|
| Andon Board | Workspace | What the plant looks like right now: every machine, its state, how long it has been in it, and what it is running. The wall screen and the shift report read the same query. | 0 | 0 | 0 |
| OEE Board | Workspace | Availability, performance and quality drawn as the time ladder they come from — because a plant told its OEE is 62% can do nothing with that, and one told it lost 340 minutes to changeovers can. | 0 | 0 | 0 |
| Equipment | List | The physical machine, which is neither the work center (a scheduling object) nor the fixed asset (a ledger one). It names both. | 13 | 21 | 3 |
| Machine States | List | One row per state, opened when it starts and closed when it ends. A stop with no reason is the queue a supervisor clears — and until it is cleared, the loss analysis is unreliable. | 11 | 0 | 1 |
| OEE Periods | Read-only list | The computed answer per machine per shift, with every input kept beside it — because a figure recomputed against today’s nameplate rate cannot be compared with last quarter. A period is not typed in: Compute OEE works it out for a day from the machine states and counts. | 16 | 0 | 1 |
| Loss Analysis | Report | The six big losses in minutes, ranked. A plant told it lost 340 minutes to changeovers can act; one told its OEE is 62% cannot. | 0 | 0 | 0 |