TRANXACT.AI Help
Manufacturing › Quality Planning

Control Charts

Limits computed FROM THE PROCESS, never from the specification — a process comfortably inside a wide tolerance can be wildly out of control and nobody would see it.

Where to find it

  1. Module: Manufacturing
  2. Group: Control
  3. Section: Quality Planning
  4. Screen: Control Charts

Address in the console: /mfg/control-charts

List · 14 columns · 15 fields on its form · 2 of them required · 2 actions

What the list shows

These are the columns of the list, in the order they are drawn. Any of them can be sorted on, filtered on, hidden, or exported.

ColumnKindField name
ChartCodechart_no
NameTextname
ItemCodeitem_no
CharacteristicTextcharacteristic
TypeStatuschart_type
nNumbersubgroup_size
CentreNumbercenter_line
LCLNumberlcl
UCLNumberucl
CpNumbercp
CpkNumbercpk
SubgroupsNumbersubgroups
ExcursionsNumberout_of_control
StatusStatusstatus

The form

What is asked for when a record is created here. Required fields are marked; a choice drawn from a configuration list is one an administrator can extend without a release.

FieldTypeChoicesNotes
Name required Text
Item Choice Looked up from existing records
Characteristic required Text
From an inspection plan Choice Looked up from existing records
Work center Choice Looked up from existing records
Machine Choice Looked up from existing records
Chart type Choice xbar_r, xbar_s, individuals, moving_range, p, np, c, u, ewma, cusum
Unit Text
Subgroup size Number
Specification minimum Number
Specification maximum Number
Target Number
Baseline from Date
Baseline to Date
Status Choice active, draft, baseline, out_of_control, suspended, retired

What you can do here

Set limits from the process primary

On each row of the list.

Compute control limits and capability

Asks for: Baseline from Baseline to

Record a subgroup

On each row of the list.

Record readings

Asks for: Chart* Readings (comma separated)* Lot Production order Shift Notes

* required

The rules that apply here

Everything on this screen obeys the platform rules rather than rules of its own. The ones worth knowing before you use it:

Beside it in Quality Planning