TRANXACT.AI Help
Manufacturing › Shop Floor

Confirmations

What was made at each operation, by whom and on what. Good, scrap and rework are three quantities with three costs, and setup time is separated from run time.

Where to find it

  1. Module: Manufacturing
  2. Group: Make
  3. Section: Shop Floor
  4. Screen: Confirmations

Address in the console: /mfg/confirmations

Read-only list · 15 columns · 1 action

This list is read-only: its records are written by the work that produces them. A correction, where one is possible at all, is made where the record was created.

What the list shows

These are the columns of the list, in the order they are drawn. Any of them can be sorted on, filtered on, hidden, or exported.

ColumnKindField name
ConfirmationCodeconfirmation_no
OrderCodeorder_no
OpNumberop_no
ItemCodeitem_no
Work centerCodework_center_code
MachineCodeequipment_no
ShiftCodeshift_code
GoodNumberqty_good
ScrapNumberqty_scrap
ReworkNumberqty_rework
Yield %Numberyield_pct
SetupNumbersetup_minutes
RunNumberrun_minutes
FromStatussource
StartedDate and timestarted_at

What can be corrected

The fields offered when an existing record is edited. Whether the button appears at all is decided per record — see What may be changed.

FieldTypeChoicesNotes
Notes Long text

What you can do here

Report work primary

On the toolbar, above the list.

Confirm an operation

Asks for: Operation* Good quantity Scrap quantity Scrap reason To rework Setup minutes Run minutes Machine Shift Operator Backflush the components This finishes the operation Notes

* required

The rules that apply here

Everything on this screen obeys the platform rules rather than rules of its own. The ones worth knowing before you use it:

Beside it in Shop Floor