TRANXACT.AI Help
Manufacturing › Material Planning

Supply Plans

The netting runs, seen from the plant. Supply Chain owns the engine — a second one would be a second answer to "what should we build". Read-only here.

Where to find it

  1. Module: Manufacturing
  2. Group: Plan
  3. Section: Material Planning
  4. Screen: Supply Plans

Address in the console: /scm/supply-plans

Read-only list · 10 columns

This list is read-only: its records are written by the work that produces them. A correction, where one is possible at all, is made where the record was created.

What the list shows

These are the columns of the list, in the order they are drawn. Any of them can be sorted on, filtered on, hidden, or exported.

ColumnKindField name
PlanCodeplan_no
NameTextname
TypeStatusplan_type
CapacityStatuscapacity_mode
FromDatehorizon_from
ToDatehorizon_to
ItemsNumberitems_planned
ProposedNumberorders_proposed
ExceptionsNumberexceptions_raised
StatusStatusstatus

The rules that apply here

Everything on this screen obeys the platform rules rather than rules of its own. The ones worth knowing before you use it:

Beside it in Material Planning