OEE Periods
The computed answer per machine per shift, with every input kept beside it — because a figure recomputed against today’s nameplate rate cannot be compared with last quarter. A period is not typed in: Compute OEE works it out for a day from the machine states and counts.
Where to find it
- Module: Manufacturing
- Group: Plant Equipment
- Section: Equipment & OEE
- Screen: OEE Periods
Address in the console: /mfg/oee-periods
Read-only list · 16 columns · 1 action
This list is read-only: its records are written by the work that produces them. A correction, where one is possible at all, is made where the record was created.
What the list shows
These are the columns of the list, in the order they are drawn. Any of them can be sorted on, filtered on, hidden, or exported.
| Column | Kind | Field name |
|---|---|---|
| Date | Date | period_date |
| Machine | Code | equipment_no |
| Shift | Code | shift_code |
| Planned | Number | planned_production_minutes |
| Run | Number | run_minutes |
| Down | Number | down_minutes |
| Setup | Number | setup_minutes |
| Good | Number | good_count |
| Reject | Number | reject_count |
| Avail % | Number | availability_pct |
| Perf % | Number | performance_pct |
| Qual % | Number | quality_pct |
| OEE % | Number | oee_pct |
| TEEP % | Number | teep_pct |
| Largest loss | Status | biggest_loss |
| vs target | Number | vs_target |
What you can do here
Compute OEE primary
Compute OEE for a day
Asks for: Date One machine only
The rules that apply here
Everything on this screen obeys the platform rules rather than rules of its own. The ones worth knowing before you use it:
- Narrowing a list — search, conditions, sort, totals, export and saved views.
- What may be changed — the five grounds a record may not be edited on.
- Companies and business units — what the switcher above this list is doing to it.