TRANXACT.AI Help
Manufacturing › Equipment & OEE

OEE Periods

The computed answer per machine per shift, with every input kept beside it — because a figure recomputed against today’s nameplate rate cannot be compared with last quarter. A period is not typed in: Compute OEE works it out for a day from the machine states and counts.

Where to find it

  1. Module: Manufacturing
  2. Group: Plant Equipment
  3. Section: Equipment & OEE
  4. Screen: OEE Periods

Address in the console: /mfg/oee-periods

Read-only list · 16 columns · 1 action

This list is read-only: its records are written by the work that produces them. A correction, where one is possible at all, is made where the record was created.

What the list shows

These are the columns of the list, in the order they are drawn. Any of them can be sorted on, filtered on, hidden, or exported.

ColumnKindField name
DateDateperiod_date
MachineCodeequipment_no
ShiftCodeshift_code
PlannedNumberplanned_production_minutes
RunNumberrun_minutes
DownNumberdown_minutes
SetupNumbersetup_minutes
GoodNumbergood_count
RejectNumberreject_count
Avail %Numberavailability_pct
Perf %Numberperformance_pct
Qual %Numberquality_pct
OEE %Numberoee_pct
TEEP %Numberteep_pct
Largest lossStatusbiggest_loss
vs targetNumbervs_target

What you can do here

Compute OEE primary

On the toolbar, above the list.

Compute OEE for a day

Asks for: Date One machine only

The rules that apply here

Everything on this screen obeys the platform rules rather than rules of its own. The ones worth knowing before you use it:

Beside it in Equipment & OEE