Maintenance Plans

What should be done, how often, and measured how — by calendar, by running hours, by cycles, or by a condition somebody is monitoring. The three are different strategies with different costs.

Where to find it

  1. Module: Manufacturing
  2. Group: Maintain
  3. Section: Maintenance
  4. Screen: Maintenance Plans

Address in the console: /mfg/maintenance-plans

List · 14 columns · 23 fields on its form · 2 of them required · 2 actions

What the list shows

These are the columns of the list, in the order they are drawn. Any of them can be sorted on, filtered on, hidden, or exported.

ColumnKindField name
PlanCodeplan_no
NameTextname
MachineCodeequipment_no
CriticalityStatuscriticality
TypeStatusmaintenance_type
TriggerStatustrigger_type
Every (days)Numberinterval_days
Every (meter)Numberinterval_meter
LeadNumberlead_days
Next dueDatenext_due_date
DaysNumberdays_to_due
TasksNumbertask_count
ShutdownTextrequires_shutdown
ActiveTextis_active

The form

What is asked for when a record is created here. Required fields are marked; a choice drawn from a configuration list is one an administrator can extend without a release.

FieldTypeChoicesNotes
Name required Text
Description Long text
Machine Choice Looked up from existing records
Equipment class Choice Configuration list
Work center Choice Looked up from existing records
Type Choice preventive, predictive, condition_based, inspection, lubrication, calibration, statutory, autonomous
Triggered by required Choice calendar, meter, condition, event, manual
Interval (days) Number
Meter Choice running_hours, cycles, units_produced, distance, starts
Interval (meter units) Number
Condition rule Choice Looked up from existing records
Raise the order (days ahead) Number A plan that raises its order on the due date is a plan that is always late.
The machine has to stop Yes or no
Estimated hours Number
Estimated cost Number
Crew size Number
Trade Choice Configuration list
Failure mode it prevents Choice Looked up from existing records
Procedure Choice Looked up from existing records
Next due Date
Next due at meter Number
Active Yes or no
Notes Long text

What you can do here

Generate due work primary

On the toolbar, above the list.

Asks for confirmation: Raise orders for everything due inside its lead time? A plan that already has an open order for this cycle is skipped, so a re-run does not double up.

Task list

On each row of the list.

The rules that apply here

Everything on this screen obeys the platform rules rather than rules of its own. The ones worth knowing before you use it: