TRANXACT.AI Help
Manufacturing › Order Costing & Profitability

Operation Time Variance

What the routing said each operation would take and what it took, so an estimate that is consistently wrong can be corrected rather than argued about.

Where to find it

  1. Module: Manufacturing
  2. Group: Cost
  3. Section: Order Costing & Profitability
  4. Screen: Operation Time Variance

Address in the console: /mfg/operation-time-variance

Read-only list · 15 columns

This list is read-only: its records are written by the work that produces them. A correction, where one is possible at all, is made where the record was created.

What the list shows

These are the columns of the list, in the order they are drawn. Any of them can be sorted on, filtered on, hidden, or exported.

ColumnKindField name
OrderCodeorder_no
OpNumberop_no
OperationTextdescription
Work centreCodework_center_code
WhereTextwork_center_name
StatusStatusstatus
Estimated (min)Numberestimated_minutes
Actual (min)Numberactual_minutes
Variance (min)Numberminute_variance
Variance %Numbervariance_pct
GoodNumberqty_good
ScrapNumberqty_scrap
ReworkNumberqty_rework
OutsideYes or nois_subcontracted
InspectionStatusinspection_status

The rules that apply here

Everything on this screen obeys the platform rules rather than rules of its own. The ones worth knowing before you use it:

Beside it in Order Costing & Profitability