Schedule Entries
One bar on the Gantt. What makes it a schedule rather than a calendar is the dependency: operation 20 cannot start before operation 10 has finished.
Where to find it
- Module: Supply Chain
- Group: More
- Section: Reachable by link
- Screen: Schedule Entries
Address in the console: /scm/schedule-entries
List · 12 columns · 20 fields on its form · 5 of them required
This screen carries no tile on the module page. It is reached from the record it belongs to, from a saved view, or by its address.
What the list shows
These are the columns of the list, in the order they are drawn. Any of them can be sorted on, filtered on, hidden, or exported.
| Column | Kind | Field name |
|---|---|---|
| Schedule | Code | schedule_no |
| Resource | Text | resource_name |
| Sequence | Number | sequence_no |
| What | Text | label |
| Reference | Code | reference_no |
| Start | Date and time | planned_start |
| End | Date and time | planned_end |
| Minutes | Number | duration_minutes |
| Due | Date and time | due_at |
| Hours late | Number | hours_late |
| Pinned | Yes or no | is_pinned |
| Status | Status | status |
The form
What is asked for when a record is created here. Required fields are marked; a choice drawn from a configuration list is one an administrator can extend without a release.
| Field | Type | Choices | Notes |
|---|---|---|---|
| Schedule required | Choice | Looked up from existing records | |
| Resource required | Choice | Looked up from existing records | |
| Sequence | Number | ||
| Type | Choice | operation, setup, run, maintenance, break, trip, stop, loading, unloading, changeover, idle, blocked | |
| What required | Text | ||
| Reference | Text | ||
| Quantity | Number | ||
| Start required | Date and time | ||
| End required | Date and time | ||
| Actual start | Date and time | ||
| Actual end | Date and time | ||
| Setup minutes | Number | ||
| Run minutes | Number | ||
| Due | Date and time | ||
| Cannot start before | Choice | Looked up from existing records | |
| Pinned — do not move it | Yes or no | ||
| Color | Colour | ||
| Progress % | Number | ||
| Status | Choice | planned, released, in_progress, paused, completed, late, blocked, cancelled | |
| Notes | Long text |
The rules that apply here
Everything on this screen obeys the platform rules rather than rules of its own. The ones worth knowing before you use it:
- Narrowing a list — search, conditions, sort, totals, export and saved views.
- What may be changed — the five grounds a record may not be edited on.
- Companies and business units — what the switcher above this list is doing to it.
- Creating a record — required fields, where choices come from, and how the number is allocated.
- Importing a spreadsheet — this screen accepts one, and it runs through the same rules as typing.
Beside it in Reachable by link
- Item · Organizations
- Item · Sales
- Item · Purchasing
- Item · Planning
- Item · Work Definition
- Item · Engineering Revisions
- Item · Stocking Policy
- Item · Warehouse
- Item · Quality
- Item · Costing
- Item · Lot & Serial Control
- Supplier Sites
- Supplier · Buying Context
- Supplier · Financial
- Supplier · Bank Details
- Supplier · Certifications
- Supplier · Diversity
- Supplier · Exclusions
- Configurator · Questions
- Configurator · Options
- Configurator · Rules
- Slotting Recommendations
- Load Stops
- On the Deck
- Rate Bands
- Freight Order Lines
- Quote Options
- Customs Lines
- Freight Invoice Lines