TRANXACT.AI Help
Manufacturing › Master Scheduling

Master Schedule Board

The grid a master scheduler works in: forecast and orders consumed against each other, the balance carried forward, and available-to-promise per period — with the two fences shaded, because inside them the schedule is a promise rather than a plan.

Where to find it

  1. Module: Manufacturing
  2. Group: Plan
  3. Section: Master Scheduling
  4. Screen: Master Schedule Board

Address in the console: /mfg/mps-board

Workspace · 0 columns

The rules that apply here

Everything on this screen obeys the platform rules rather than rules of its own. The ones worth knowing before you use it:

Beside it in Master Scheduling