Manufacturing › Master Scheduling
Rough-Cut Capacity
The load a master schedule would place on the critical resources, months before a routing is ever exploded. Kept as history so this plan can be compared with last month’s.
Where to find it
- Module: Manufacturing
- Group: Plan
- Section: Master Scheduling
- Screen: Rough-Cut Capacity
Address in the console: /mfg/rough-cut-loads
Read-only list · 8 columns
This list is read-only: its records are written by the work that produces them. A correction, where one is possible at all, is made where the record was created.
What the list shows
These are the columns of the list, in the order they are drawn. Any of them can be sorted on, filtered on, hidden, or exported.
| Column | Kind | Field name |
|---|---|---|
| Schedule | Code | schedule_no |
| Work center | Code | work_center_code |
| Constraint | Text | is_constraint |
| Period | Code | period_code |
| Required | Number | required_hours |
| Available | Number | available_hours |
| Utilization % | Number | utilization_pct |
| Overload | Number | overload_hours |
The rules that apply here
Everything on this screen obeys the platform rules rather than rules of its own. The ones worth knowing before you use it:
- Narrowing a list — search, conditions, sort, totals, export and saved views.
- What may be changed — the five grounds a record may not be edited on.
- Companies and business units — what the switcher above this list is doing to it.