TRANXACT.AI Help
Manufacturing › Master Scheduling

Rough-Cut Capacity

The load a master schedule would place on the critical resources, months before a routing is ever exploded. Kept as history so this plan can be compared with last month’s.

Where to find it

  1. Module: Manufacturing
  2. Group: Plan
  3. Section: Master Scheduling
  4. Screen: Rough-Cut Capacity

Address in the console: /mfg/rough-cut-loads

Read-only list · 8 columns

This list is read-only: its records are written by the work that produces them. A correction, where one is possible at all, is made where the record was created.

What the list shows

These are the columns of the list, in the order they are drawn. Any of them can be sorted on, filtered on, hidden, or exported.

ColumnKindField name
ScheduleCodeschedule_no
Work centerCodework_center_code
ConstraintTextis_constraint
PeriodCodeperiod_code
RequiredNumberrequired_hours
AvailableNumberavailable_hours
Utilization %Numberutilization_pct
OverloadNumberoverload_hours

The rules that apply here

Everything on this screen obeys the platform rules rather than rules of its own. The ones worth knowing before you use it:

Beside it in Master Scheduling