Manufacturing › Master Scheduling

Bills of Resources

What one unit costs in critical-resource time — deliberately coarser than the routing. The offset matters: press time for something shipped in week 14 is spent in week 11.

Where to find it

  1. Module: Manufacturing
  2. Group: Plan
  3. Section: Master Scheduling
  4. Screen: Bills of Resources

Address in the console: /mfg/resource-profiles

List · 8 columns · 12 fields on its form · 2 of them required

What the list shows

These are the columns of the list, in the order they are drawn. Any of them can be sorted on, filtered on, hidden, or exported.

ColumnKindField name
ItemCodeitem_no
#Numberline_no
Work centerCodework_center_code
ResourceTextresource_label
Hours/unitNumberhours_per_unit
Setup hNumbersetup_hours
OffsetNumberoffset_periods
CriticalTextis_critical

The form

What is asked for when a record is created here. Required fields are marked; a choice drawn from a configuration list is one an administrator can extend without a release.

FieldTypeChoicesNotes
Item required Choice Looked up from existing records
Line Number
Work center Choice Looked up from existing records
Capacity resource Choice Looked up from existing records The Supply Chain resource that does the load arithmetic. Named rather than copied.
Label Text
Hours per unit required Number
Setup hours Number
Offset (periods earlier) Number
Critical resource Yes or no
Effective from Date
Effective to Date
Notes Long text

The rules that apply here

Everything on this screen obeys the platform rules rather than rules of its own. The ones worth knowing before you use it: