MRP Options: grouping production orders and consolidating requisitions
Manufacturing › Plan › Material Planning › MRP Options is the screen for the two switches release 20261023 added: whether sales-order lines built to the same answers become one production order, and whether a bought item is one requisition line for its total.
| विकल्प | On (as shipped) | Off |
|---|---|---|
| Group production orders by configuration answers | Lines of one product built to the same configuration answers are planned and made as one production order for their total quantity. Lines with different answers always stay separate. | One production order per order line. |
| Consolidate requisitions: one line per bought item | One requisition line per bought item for the total it needs, however many configurations or order lines need it. | One requisition line per planning row. |
- They decide how Run MRP plans configured sales order lines. They apply to the next run; what has already been planned or firmed is not changed.
- The ? beside each option says the same in a sentence.
- Display reads them and change saves them: the grant “MRP options” on Roles. Without the change grant the screen says “You can read these options; changing them needs the "MRP options" change grant.”