When an approver is unavailable: backup, same designation, escalation and the emergency route
Since release 20261106d each purchase order and requisition approval level can name a backup approver and the order in which to try the backup, someone with the same designation and escalation; and an approval rule can name who approves an urgent document, from an amount you set, as well as or instead of its levels.
Since release 20261106d. The backup and the order are set on each level, on Supply Chain › Purchasing › Procurement Control › Approval Levels. The emergency route is set on the rule, on Supply Chain › Purchasing › Requisitions & Orders › PO Approval Rules or Supply Chain › Purchasing › Procurement Control › Requisition Approval Rules. Everything here works the same way for purchase orders and for requisitions.
When an approver is unavailable
- On approved leave in HRMS covering today, or not an active employee in HRMS.
- Without a working sign-in.
- Not deciding within the level’s Escalate after (hours).
A backup approver
Backup approver on a level is a named person (their sign-in), an employee (HRMS) or anyone holding a role. Fill in Backup: person, Backup: employee or Backup: role, whichever you chose.
What to try, and in which order
When the approver is unavailable, try offers every order of three steps, so your company sets the priority — for example “the backup approver, then someone with the same designation, then escalate”.
| Schritt | Who it goes to |
|---|---|
| the backup approver | The level’s Backup approver. |
| someone with the same designation | Another active employee in the same HRMS position or, if there is none, with the same job. |
| eskalieren | Whoever Escalate to names: the next level, else the approver’s manager in HRMS; a named person; or anyone holding a role. It escalates after Escalate after (hours), or at once when Escalate at once when the approver is away is ticked. |
- The steps are tried in this order when the document is sent, and again while it waits.
- Left empty, the level uses escalation alone, as before.
Whoever takes over must be able to sign in and must not be on leave. It is never the person who raised the document, nor somebody who has already signed it.
Urgent documents: the emergency route
For urgent spending, a PO Approval Rule or a Requisition Approval Rule can name who approves a document marked Urgent:
| Feld | Was es aussagt |
|---|---|
| Urgent documents are approved by | A named person (their sign-in), or anyone holding a role such as Director or VP. Then choose Urgent: person or Urgent: role. Empty: an urgent document goes through the levels like any other. |
| Urgent: from amount (inclusive) | Only urgent documents worth at least this much, in the company’s currency. 0: every urgent one. |
| Urgent: with the levels or instead | As well as the levels (one more signature, after them), or Instead of the levels (that signature only). |
- Tick Urgent on the purchase order or requisition, when you raise it or while it waits.
- Where its rule names who approves urgent documents, and its amount is at or above Urgent: from amount, it goes to them as the rule says.
- Marking an order Urgent while it waits routes it again.
The emergency approver is never the person who raised the document. If the named person’s sign-in is switched off, or nobody else holds the role, the normal levels decide it, and the Approvals panel says why.
Seeing what happened
- The Approvals panel on the order or requisition shows every step: who was asked, why anyone was passed over, and who finally approved.
- On Approval Levels, the optional columns Backup, When unavailable, Escalates after (h), Escalates when away and Escalates to show how each level is set. The optional column Urgent orders on PO Approval Rules, and Urgent requisitions on Requisition Approval Rules, say who approves urgent documents.
- Purchase Orders and Requisitions have an optional Urgent column.
See Choosing who approves a purchase order or requisition, and Handing over your approvals while you are away.
Someone who has left (since release 20261106f)
- An approver who is terminated in HRMS counts as unavailable, just like someone on approved leave. So does someone whose sign-in is switched off and who has no employee record.
- Their waiting approvals move straight away when the employee is terminated, or their status is changed, on HRMS. It does not wait for the next escalation check. This covers purchase orders, requisitions and hiring requests.
- With Escalate at once when the approver is away, the approval escalates: to the next level if the level may be skipped, otherwise to the leaver’s manager in HRMS or to whoever Escalate to names. With When the approver is unavailable, try, the steps are tried in the order listed.
- If a level has no escalation set up, nothing moves on its own. Use Reassign. See Approving on behalf and reassigning approvals.