TRANXACT.AI உதவி

Adjusting the bill of material and process for one line

Since release 20261113 the 360° view of a quotation or sales-order line has an Adjust BOM & process tab: change how much of a part this line needs, drop a part, add components and operations, and see the cost as Standard, Additional and Total. Only that line changes.

  1. Open CRM › Order to Cash › Selling › Quotations (or Sales Orders), open the document, and on the Lines tab open the line’s 360° view.
  2. Choose the Adjust BOM & process tab. It shows the bill of material and operations generated for the line from master data and the configuration.
  3. To change how much of a part this line needs, type a new quantity per unit in Qty per unit for this line. Press Drop to leave the part out (quantity 0).
  4. Under Additional components on this line, press Add a component, choose the material code and enter a quantity per unit. If the item has no price and you may see costs, type a unit cost; it is marked as an assumption.
  5. Under Additional operations on this line, press Add an operation, choose the work centre and enter a description, the setup minutes (once for the line’s quantity) and the labour and machine minutes per unit.
  6. Press Save adjustments. With Quotation Costing you see the cost by element as Standard, Additional and Total, and anything that could not be costed (a part with no price, a work centre with no rate).
  7. On the Cost tab, price from the total cost (mark-up or target margin) and save the estimate as a revision. The revision keeps the adjustments.

What changes, and what does not

  • Only this line changes. The master bill of material, routing and configuration, and every other quotation and order, stay as they are.
  • When the quotation is accepted, the adjustments go to the sales-order line.
  • Run MRP on that order puts them on the production order made for that line. Since release 20261114 nothing is copied when the production order covers more than one line or an adjustment is below the product’s own level; see Line BOM and process adjustments on production orders.

Who can, and when

  • Adjusting needs the role grant Line BOM & Process Adjustments (on Platform › Access & Security › Access › Roles) plus the right to change the document.
  • A quotation can be adjusted while it is a draft or sent; a sales-order line while it has not been delivered, invoiced or put into production.
  • Costs are shown only with the Quotation Costing grant.

See also Costing a quotation line.